Origin Energy

A project for Origin Energy at Coffs Harbour involved the installation of new pressure and level transmitters on the existing LPG storage tanks. A PLC and SCADA system was installed to provide local indication, trending and also to enable head office to dial in and monitor the tank storage levels. A duplicate system was also installed at the Newcastle depot.