Orica

This latest project for Orica was the construction of # 3 Nitric Acid plant. Incorporated to the construction of the plant was the following equipment:

  • Over 300 instruments and control valves
  • MCC
  • Toshiba PLC
  • Citect System and Triconex Trip System

We were contracted by Orica to provide solutions in several different stages. The first stage of this project was to ensure all electrical/instrument systems were supplied according to Orica specifications. The second stage of the project involved supervising construction and commissioning each and every system on the plant. The final stage involved generation and checking of all schematics and instrument data sheets.